Category: | Cycleway: A problem that needs to be fixed |
Tags: | aberdulais, ncn47 |
Date time: | 11.40am, Wednesday 16th May, 2012 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Aberavon |
NCN 47 follows this bridleway through private land where no Sustrans signs have been allowed.
Comments reflect the views of the original submitter only.